Skip to content

PUBLISHER: Transnet (www.transnet.net)

As of 15 October 2024, both Pier 1 and Pier 2 have resumed operations after being windbound.

  • Pier 1: Began operations at 06:20 and is currently on standby due to wind conditions, with recorded gusts exceeding 90 km/h since 07:10.
  • Pier 2: Resumed operations at 20:00 on 14 October 2024 but has also been placed on standby since 02:30 today, with gusts reaching over 82 km/h.

While port operations have recommenced, we want to emphasize that the weather can be unpredictable, and there is a possibility of ports becoming windbound again. This could lead to potential delays in operations.

Transnet Update: Pier 1

Transnet Update: Pier 2